Thursday, September 19, 2013

Drainage Canal Dredging

THE PLAYERS Stadium interior lakes are controlled by a series of spill ways. To raise or lower the lakes, panels are removed or reinstalled. Over the years material has accumulated in the outer canals which is interfering with the flow. Today MacCurrach Construction started the dredging process to remove this material. This process will greatly improve the flow, allowing the Stadium Course to drain at a much greater speed.