Tuesday, March 5, 2013

Dye's Valley HUB Renovation- Day 2

Work continued in full force on Dye's Valley practice facility renovation today.  The main focuses of today's workload was on moving an electrical conduit, removing the old green's mix from the putting green, and demolishing the mound for the new putting green.  The electrical conduit was moved because its original location would be under the new putting green and it was too shallow for our purposes.  The old putting green's soil mix was removed and placed to the side to be used as the subgrade for the approaches on the new chipping green. 

A contractor is preparing to run a conduit containing POS/data cables, alarm system wires, and telephone lines

The old putting green's soil mix is removed for use at a later date

Demolition of the new putting green mound continues