Thursday, March 14, 2013

Dye's Valley HUB - Day 10

As work continues on The Dye's Valley Hub renovation today, Progress was made on the chipping green sub-grade.  A greens bowl liner was installed which allows us to separate the greens mix from the surrounding native soil.  Lateral drain lines were also installed in 4 inch trenches and topped with 4 inches of gravel chips.  


The drainage and gravel installation began today. The black liner seen in the photo is used to separate the greens mix from surrounding native soils.


A GPS system is used for mapping the drain tiles.


The bowl of the putting green was finalized. The flags shown are used for grading.