Dye's Valley HUB- Day 13

As work continued on the HUB project today, the final additions of greens mix were added to the chipping green and the surface grade was perfected. Work also began on the putting green sub-grade as the installation of the green's drainage and gravel layer began. 


The chipping green is ready for irrigation, final grading and then grassing.



Drainage and gravel layer being installed in the new putting green.