Stadium Course: #18 Lake Transfer Line Issues.

On #18 of THE PLAYERS Stadium Course we have recently faced challenges with our transfer pump.  This pump allows us to draw water to help fill our irrigation lake when water usage is high, or lower lake level. Recently the agronomy staff encountered some material that has impeded water flow through the pipe between our irrigation lake and #18. Upon further investigation we discovered a 90 degree fitting which is where most of the material has collected. The agronomy staff is installing two 45 degree coupling to make the turn less restricting.   




Andrew Collier in the lake at the source